HOME  »  teardrop »  Viewing frame13     [Image 15 of 86]  :: Jump To  
Comment: October 16th 2003 - Some 5/16" flat steel was bent and scabbed onto the rails where the bends were made for extra strength.
October 3rd 2003 - Frame completed with several coats of of paint. The exposed front part of the frame will be painted white as will be the connector.

October 3rd 2003 - Although torsion axles install easier and are a little less expensive I chose leafs. Both suspensions can break but the springs are available most everywhere, very easy to replace and you can limp into a town for parts. Torsion's are made to order and if one fails the tear is stranded for as long as it takes to make a new one - sometimes weeks.  If towed it must be put on a flatbed which depending on mileage could exceed the cost of the original build.

October 3rd 2003 - Trial fit to make sure the axle and suppension fit correctly. It's a 2000/lb 4 drop axle with 1000/lb springs on 39 centers.
Note: This combination worked perfect with no bounce or sway in heavy cross winds.

October 5th 2003 - Underside of the connector is welded in place. The chains will also be welded to the frame.

October 16th 2003 - Just trying an idea to mount some swivel casters up underneath in back to help me out of my steep driveway.  Won't install unless needed on the first trip out the drive.
Note: They were never needed.

Next slide
 
October 16th 2003 - OK . . . frame's finished so it's time to put away the welder and dust off the woodworking tools. The Toyota truck (same bolt pattern as Ford) wheels came from a wrecking yard with these old tires installed which will be replaced on completion.
Note: when finished the tires were replaced with P205/R75-14's

October 23rd 2003 - Floor is 3/4 birch plywood with 1-5/8 X 2-1/4 frame rails glued and two inch screws every three inches.

October 23rd 2003 - Took lots of pains to get the floor and frame to size which makes the rest of the building go so much easier. The six carriage bolts mounting floor to frame have double nuts locked together which should stay tight.

November 14th 2003 - Several coats of marine spar varnish before bolting to frame.  After priming the frame received three coats of gloss black Rust-O-Lium.

November 16th 2003 - After the floor was built it got three coats of marine spar varnish on the underside before bolting to chassis.

  Previous slide      Index Page Start/Stop the slide show      Next slide  
Album last updated on Jul 28, 2008 - 12:43 PM
© 2000 - 2020 Dennis Unfried
Any questions or suggestions: E-mail